104 articles for

January 2009

U.S. STEEL: Accrues $87M as of Sept. 30 for Environment Projects

United States Steel Corporation, as of Sept. 30, 2008, accrued a total of US$87 million for environmental obligations in the West Grand Calumet Lagoon and other projects at or related to Gary Works where the scope of work is defined.

The…

U.S. STEEL: Still Working with EPA on Lorain Site RCRA Study

United States Steel Corporation is still working with the Ohio Environmental Protection Agency (Ohio EPA) related to Resource Conservation and Recovery Act (RCRA) Corrective Action at the Lorain Tubular facility.

In September 2006, the Company received a letter from the Ohio…

U.S. STEEL: Accrues $20.9M at Sept. 30 to Shut Down Waste Sites

United States Steel Corporation, at Sept. 30, 2008, accrued US$20.9 million for estimated costs to close three hazardous waste disposal sites and perform related groundwater monitoring at its Gary Works facility.

At Gary Works, U. S. Steel has agreed to close…

U.S. STEEL: Accrues $4.6M for Grand Calumet River Cleanup Costs

United States Steel Corporation, at Sept. 30, 2008, has a total accrued liability of US$4.6 million based on the estimated remaining costs in connection with a section of the Grand Calumet River that runs through Gary Works facility.

On Jan. 26,…

Page 11 of 11« First...«7891011